All prints are made-to-order and will require one to two weeks’ production time before being shipped. Each order will be acknowledged after payment has been received to confirm the shipping date. To customers who order prints of the same image subsequent to their original order, there may be slight variations in image density and/or contrast when compared to the initial print. If exact matching prints are desired, these should be ordered at the same time.
All prints are shipped flat, durably mounted on high quality backing board with two inch borders top and sides and a five inch border at bottom.
Custom Matting and Framing crafted to fit the Mount Board Size shown will be required to complete the presentation. The bottom border will show below the lower right corner of the image the photographer’s signature. Due to slight size variations please await receipt of your mounted print before ordering custom matting and framing from your local vendor.
Reproduction or publishing of prints sold on this website and related websites in whole or in part in any form, photographically, digitally, or otherwise, is strictly prohibited. The purchase of a print on this website is intended for buyer’s exclusive use in a single display location, and buyer accepts these conditions without modification. Please see Terms and Conditions of Sale for further clarification and additional terms and conditions for the sale of prints.
Rio Grande Zephyr West Bound Entering Horseshoe Bend East of Glenwood Springs, Colorado, April, 1983.
Price range: $699.00 through $1,099.00
In stock
Horseshoe Bend, immediately east of Glenwood Springs is the beginning of Glenwood Canyon, which stretches eastward for approximately 17 miles. Through Glenwood Canyon in 1983 ran the Colorado River, the Denver and Rio Grande Railroad (now the Union Pacific Railroad), and US Highway 6. By the end of April, 1983, the Zephyr had made its last run, replaced by Amtrak. In this view taken on Kodak transparency film with a Calumet View Camera and either a 90mm f5.6 Super Angulon or a 150mm f5.6 Symmar lens (my records are unclear), the Colorado River flows downstream from left to right while the train is headed downstream as well. Construction was well underway on the massive I-70 four-lane project in Glenwood Canyon on the north side of the river, which used nearly all of the US 6 right-of-way. The railroad tracks, constructed in the 19th Century on the south side of the river, were virtually untouched by the highway construction.
The logo is a security watermark and will not appear in your
size:
24X20, 20X16, 16X13 7/8

